The new drain for the utility. It used to half a 1 1/2 inch waste sunk underground running into a drain int he rear hall. Apparently, this is illegal - only 4in pipes can be underground, so we're getting another new drain laid.
The rear porch is coming on. Now they need to join the sloping roof of the old rear hall to the new flat section and install the box gutters etc.
The front hall on sunday night
and on monday night
We have stripped the stairwell wallpaper, and luckily the plaster is not that bad - just have to find a safe way of painting... time for a longer broom handle on the roller.
The kitchen..... here is the island run with temporary worktop and a gap for the dishwasher. You can see the sink at the end - not the usual installation, it woudl normally face into a corner with walls either side.
The whole kitchen. Top left are two 1000mm drawer units and a 600 drawer line cupboard, the drawer unit int he middle will have the hob on it. Then the corner unit before the run of tall units - oven, oven, larder with pull out wirework, fridge, broom cupboard, then a cupboard run to cover the UFH manifold.
The sink in place - a bit dusty! But you can see how big the main bowl is.
The tall unit run.
The sink complete with tap, soap dispenser and remote switch for the garbage disposal (an InSinkErator ISE65 - must be American with a name like that)
That ISE65 - didn't realise it was that big - good job it's a big cupboard. The clear plastic tube goes to the remote switch - it is an air switch.
Hopefully we'll have the hob in today and the rest of the units ready for the electrician to connect things by the weekend - maybe even a fridge!!!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment