Tuesday, 21 August 2007

Window lines

Here is the rear of the first floor. You can see the outline of the bathroom window on the left - we have lost about 3 courses of bricks at the bottom of it for the new roof. You can also the master bedroom window - this is now 7 inches wider at the left after we had the outer leaf of brick removed. You can also see the ground floor door/window opening with the CATNIC beam bricked in. Also on the left is the new opening from the extended rear porch into the house.


Plenty more beams waiting to be installed - These are for the first floor windows. I think there is still one more to come as we have the bathroom, master bedroom, en-suite and front bedroom windows.

This is the front elevation - the bedroom window is getting to lintel height.

Geoff is going to order the roof this week, so hopefully it will start going up next week sometime. Hoorah!