
The drain is flooded - luckily (I guess) it is a sealed pipe now, but the hole is filled

So Geoff spent yesterday in the pouring rain putting up the first floor joists. The beam was too low, so thepillar and wall have been built up again!

A diary of the extension and renovation of our 3 bed semi.
No comments:
Post a Comment