And the last bit of worktop is in place. Once all the shelves are in we can start loading the cupbaords and get the other rooms cleared up.
Monday, 11 August 2008
Ever closer.....
Big progress! Upstands and splashback in place! What a transformation - although it shows up the missing paint a bit...

And the last bit of worktop is in place. Once all the shelves are in we can start loading the cupbaords and get the other rooms cleared up.
And the last bit of worktop is in place. Once all the shelves are in we can start loading the cupbaords and get the other rooms cleared up.
Tuesday, 22 July 2008
Deadline approaching
Well, next Tuesday is the end of July.... so are we going to get it all?
Well the kitchen is looking better. The breakfast bar went on yesterday and we gave it the first of 3 coats of oil. The wood is Iroko. Before the first oiling it was not much darker than the floor, which looked odd, but it is darkening up nicely and should be a nice contrast when it's had the next 2 coats - plus we got a decent chopping board from the offcut! Just for scale, the breakfast bar is 3.6m x 62cm, so it's pretty big. And now we shouldn't keep banging our heads on the lights!
The bathroom has been tiled, but still needs grouting. More worrying, we still have a leak from the flat roof at the back - it tends to come in to the rear hall and run down to the thermostat. The granite has been ordered for the kitchen - the missing bit of worktop, the upstands and the splashback. The last handles have been ordered, but we are still missing the dishwasher door.
Phil has been busy finishing up everywhere, but we still have some work to do outside. The extractor for the bathroom has been capped, but the ensuite fan has not been sorted, there is still just a hole in the wall, plus there are still some bricks to finish the eaves - lets hope the birds have gone! We do have window beads everywhere now I think, all the doors and on and fit with handles.
Martin is up tonight to check on the UFH manifold and refit it once the gauge has been (re)moved - plus a beer to say thank you! We still haven't had Eric back to do the final flush of the heating before we get the boiler company in to comission it all - plus the upstairs thermostat is not connected....
Well the kitchen is looking better. The breakfast bar went on yesterday and we gave it the first of 3 coats of oil. The wood is Iroko. Before the first oiling it was not much darker than the floor, which looked odd, but it is darkening up nicely and should be a nice contrast when it's had the next 2 coats - plus we got a decent chopping board from the offcut! Just for scale, the breakfast bar is 3.6m x 62cm, so it's pretty big. And now we shouldn't keep banging our heads on the lights!
The bathroom has been tiled, but still needs grouting. More worrying, we still have a leak from the flat roof at the back - it tends to come in to the rear hall and run down to the thermostat. The granite has been ordered for the kitchen - the missing bit of worktop, the upstands and the splashback. The last handles have been ordered, but we are still missing the dishwasher door.Phil has been busy finishing up everywhere, but we still have some work to do outside. The extractor for the bathroom has been capped, but the ensuite fan has not been sorted, there is still just a hole in the wall, plus there are still some bricks to finish the eaves - lets hope the birds have gone! We do have window beads everywhere now I think, all the doors and on and fit with handles.
Martin is up tonight to check on the UFH manifold and refit it once the gauge has been (re)moved - plus a beer to say thank you! We still haven't had Eric back to do the final flush of the heating before we get the boiler company in to comission it all - plus the upstairs thermostat is not connected....
Labels:
boiler,
breakfast bar,
builder,
extension,
extractor,
heating,
iroko,
renovation,
UFH,
worktop
Thursday, 3 July 2008
Still not finished.... but
Well,
met with Geoff last night and asked 'how long would it normally take to finish from here?' 'About a week' was the answer, so on the basis of weekend working, we've agreed he'll have done by the end of the month. For things he can't directly control - how long for the worktops to be delivered, I've accepted seeing the order note, but all being well we'll be done soon.
The bathroom should be done today - the radiator on and the tiles above the sink being the main things in there. Plus the step should be sorted ready for being re-covered. Phil the joiner is in so the remaining doors should get sorted. Geoff is ordering the remaining worktop and doors for the kitchen so I'm hopeful they'll be delivered soon - the big worktops took less than a week.
Nervy today though - the valuer is coming and I'm hoping it'll be good news so we can refresh the very depleted coffers.... Fingers crossed they can see past what isn't done the the intrinsic value.
met with Geoff last night and asked 'how long would it normally take to finish from here?' 'About a week' was the answer, so on the basis of weekend working, we've agreed he'll have done by the end of the month. For things he can't directly control - how long for the worktops to be delivered, I've accepted seeing the order note, but all being well we'll be done soon.
The bathroom should be done today - the radiator on and the tiles above the sink being the main things in there. Plus the step should be sorted ready for being re-covered. Phil the joiner is in so the remaining doors should get sorted. Geoff is ordering the remaining worktop and doors for the kitchen so I'm hopeful they'll be delivered soon - the big worktops took less than a week.
Nervy today though - the valuer is coming and I'm hoping it'll be good news so we can refresh the very depleted coffers.... Fingers crossed they can see past what isn't done the the intrinsic value.
Tuesday, 10 June 2008
Update june 08
Well,
things are still going very slowly, but we had Stephen's 4th birthday party here this weekend and the house was fine for visitors - lots of visitors! Geoff got the last drawer fronts on and temporarily fixed the plinths so nothing would get lost under the cupboards over the weekend. The dishwasher landed today (the old one wouldn't wake up and we decided we may as well get one) so that needs plumbing in.
The island now has backs and is just waiting the Iroko breakfast bar - hence the gap at the top!

The light switches and lights on the pillar have worked out really well.

The dining table under the Velux is really nice in the sumer - although we need blinds when the sun is very bright - like this weekend! We often only put the uplighters on in the evening.

Still the odd box around and about, but we're settling in. Time for that flat screen on the wall.....

The kids' cupboard - still not sure about the green, but the purple is great.

The hob run is looking good now. We need the upstands and splashback (more granite!) and the shelf lights chasing in, and the cover above the hood.
things are still going very slowly, but we had Stephen's 4th birthday party here this weekend and the house was fine for visitors - lots of visitors! Geoff got the last drawer fronts on and temporarily fixed the plinths so nothing would get lost under the cupboards over the weekend. The dishwasher landed today (the old one wouldn't wake up and we decided we may as well get one) so that needs plumbing in.
The island now has backs and is just waiting the Iroko breakfast bar - hence the gap at the top!

The light switches and lights on the pillar have worked out really well.

The dining table under the Velux is really nice in the sumer - although we need blinds when the sun is very bright - like this weekend! We often only put the uplighters on in the evening.

Still the odd box around and about, but we're settling in. Time for that flat screen on the wall.....

The kids' cupboard - still not sure about the green, but the purple is great.

The hob run is looking good now. We need the upstands and splashback (more granite!) and the shelf lights chasing in, and the cover above the hood.
Friday, 23 May 2008
Beds and Tiles.
Well, we have been sleeping in here for the last few weeks... nice decor!!!!

But we moved to our new bedroom on wednesday when they laid the carpet and today, the bed arrived.... It is huge, but despite how this photo looks, it takes up less than half the room.

The bathroom mirror looks nice.

And we have Amtico tile effect flooring in there. e want the flooring bods back to fix the step, but we have flooring everywhere in the house except for the landing cupboard now. That needs a floorboard replacing then the carpet can be finished.

But we moved to our new bedroom on wednesday when they laid the carpet and today, the bed arrived.... It is huge, but despite how this photo looks, it takes up less than half the room.

The bathroom mirror looks nice.

And we have Amtico tile effect flooring in there. e want the flooring bods back to fix the step, but we have flooring everywhere in the house except for the landing cupboard now. That needs a floorboard replacing then the carpet can be finished.