Showing posts with label kitchen. Show all posts
Showing posts with label kitchen. Show all posts

Monday, 21 September 2009

Finally Painted

Finally got the lounge painted last month. The red looks great and makes a contrast with the white of the units. Looks really striking coming in from the front hall.

Wednesday, 17 September 2008

Kitchen - DONE!

Well, almost.... it's done in white.


All the doors and handles are on, the walls are painted. A couple of niggles with the floor where the unit legs needed moving but otherwise, good enough. Now it's time to paint it properly....

This little vid shows how the room has changed between April and now.

Friday, 22 August 2008

Update 22-08-08

The kitchen is looking good. Two doors to go on (the dishwasher has no front) and some painting and some tidying up and all done.... Starting to look worth the effort now.

Eric the plumber came today and the heating system has been flushed. He is coming back on tuesday to fit a strainer to the boiler return then that should see the heating system finished.

Phil is back on tuesday to finish off everything else - the kitchen, the bathroom tiling, the ensuite tiling etc. Except the bath - the electrician's insurance company are replacing that as it cannot be repaired.

Monday, 11 August 2008

Ever closer.....

Big progress! Upstands and splashback in place! What a transformation - although it shows up the missing paint a bit...


And the last bit of worktop is in place. Once all the shelves are in we can start loading the cupbaords and get the other rooms cleared up.

Tuesday, 10 June 2008

Update june 08

Well,

things are still going very slowly, but we had Stephen's 4th birthday party here this weekend and the house was fine for visitors - lots of visitors! Geoff got the last drawer fronts on and temporarily fixed the plinths so nothing would get lost under the cupboards over the weekend. The dishwasher landed today (the old one wouldn't wake up and we decided we may as well get one) so that needs plumbing in.

The island now has backs and is just waiting the Iroko breakfast bar - hence the gap at the top!


The light switches and lights on the pillar have worked out really well.


The dining table under the Velux is really nice in the sumer - although we need blinds when the sun is very bright - like this weekend! We often only put the uplighters on in the evening.


Still the odd box around and about, but we're settling in. Time for that flat screen on the wall.....


The kids' cupboard - still not sure about the green, but the purple is great.



The hob run is looking good now. We need the upstands and splashback (more granite!) and the shelf lights chasing in, and the cover above the hood.

Thursday, 14 February 2008

Small things and big things...

On the small things front, we now have a door on the ensuite (albeit with no architrave yet). Some of the block work in the rear hall has been removed as Geoff wasn't happy it was up to scratch and one of the doors on the kids' room cupboard is on.

On the bigger front the worktops were ordered yesterday for (hopefully) friday delivery. These include 2 holes for popup-power sockets from Evoline and 7 of those little metal bars for hot pans. We will unfortunately have one join on the hob run, but since that is a 3.5m run and the end which will be joined is a 90cm corner unit I suppose that is not such a surprise. The island will be a single piece though - 2.6m x 90cm, a BIG slab of 'nero absoluto' granite....

Gary the sparky has finally phoned in - he had tonsilitis so not only coudl he not come, but i expect he couldn't speak to call us either..... perhaps someone needs to show him SMS :-) He has sworn blind he and a friend will be here this weekend so we should come back to a very different lounge on monday - worktops, appliances, sockets and switches. We have decided to delay the light fittings and flooring until there is no heavy work going on, but the vast majority of the fixtures will be in place.