Showing posts with label iroko. Show all posts
Showing posts with label iroko. Show all posts

Tuesday, 22 July 2008

Deadline approaching

Well, next Tuesday is the end of July.... so are we going to get it all?

Well the kitchen is looking better. The breakfast bar went on yesterday and we gave it the first of 3 coats of oil. The wood is Iroko. Before the first oiling it was not much darker than the floor, which looked odd, but it is darkening up nicely and should be a nice contrast when it's had the next 2 coats - plus we got a decent chopping board from the offcut! Just for scale, the breakfast bar is 3.6m x 62cm, so it's pretty big. And now we shouldn't keep banging our heads on the lights!

The bathroom has been tiled, but still needs grouting. More worrying, we still have a leak from the flat roof at the back - it tends to come in to the rear hall and run down to the thermostat. The granite has been ordered for the kitchen - the missing bit of worktop, the upstands and the splashback. The last handles have been ordered, but we are still missing the dishwasher door.

Phil has been busy finishing up everywhere, but we still have some work to do outside. The extractor for the bathroom has been capped, but the ensuite fan has not been sorted, there is still just a hole in the wall, plus there are still some bricks to finish the eaves - lets hope the birds have gone! We do have window beads everywhere now I think, all the doors and on and fit with handles.

Martin is up tonight to check on the UFH manifold and refit it once the gauge has been (re)moved - plus a beer to say thank you! We still haven't had Eric back to do the final flush of the heating before we get the boiler company in to comission it all - plus the upstairs thermostat is not connected....

Tuesday, 10 June 2008

Update june 08

Well,

things are still going very slowly, but we had Stephen's 4th birthday party here this weekend and the house was fine for visitors - lots of visitors! Geoff got the last drawer fronts on and temporarily fixed the plinths so nothing would get lost under the cupboards over the weekend. The dishwasher landed today (the old one wouldn't wake up and we decided we may as well get one) so that needs plumbing in.

The island now has backs and is just waiting the Iroko breakfast bar - hence the gap at the top!


The light switches and lights on the pillar have worked out really well.


The dining table under the Velux is really nice in the sumer - although we need blinds when the sun is very bright - like this weekend! We often only put the uplighters on in the evening.


Still the odd box around and about, but we're settling in. Time for that flat screen on the wall.....


The kids' cupboard - still not sure about the green, but the purple is great.



The hob run is looking good now. We need the upstands and splashback (more granite!) and the shelf lights chasing in, and the cover above the hood.