Showing posts with label boiler. Show all posts
Showing posts with label boiler. Show all posts

Friday, 22 August 2008

Update 22-08-08

The kitchen is looking good. Two doors to go on (the dishwasher has no front) and some painting and some tidying up and all done.... Starting to look worth the effort now.

Eric the plumber came today and the heating system has been flushed. He is coming back on tuesday to fit a strainer to the boiler return then that should see the heating system finished.

Phil is back on tuesday to finish off everything else - the kitchen, the bathroom tiling, the ensuite tiling etc. Except the bath - the electrician's insurance company are replacing that as it cannot be repaired.

Tuesday, 22 July 2008

Deadline approaching

Well, next Tuesday is the end of July.... so are we going to get it all?

Well the kitchen is looking better. The breakfast bar went on yesterday and we gave it the first of 3 coats of oil. The wood is Iroko. Before the first oiling it was not much darker than the floor, which looked odd, but it is darkening up nicely and should be a nice contrast when it's had the next 2 coats - plus we got a decent chopping board from the offcut! Just for scale, the breakfast bar is 3.6m x 62cm, so it's pretty big. And now we shouldn't keep banging our heads on the lights!

The bathroom has been tiled, but still needs grouting. More worrying, we still have a leak from the flat roof at the back - it tends to come in to the rear hall and run down to the thermostat. The granite has been ordered for the kitchen - the missing bit of worktop, the upstands and the splashback. The last handles have been ordered, but we are still missing the dishwasher door.

Phil has been busy finishing up everywhere, but we still have some work to do outside. The extractor for the bathroom has been capped, but the ensuite fan has not been sorted, there is still just a hole in the wall, plus there are still some bricks to finish the eaves - lets hope the birds have gone! We do have window beads everywhere now I think, all the doors and on and fit with handles.

Martin is up tonight to check on the UFH manifold and refit it once the gauge has been (re)moved - plus a beer to say thank you! We still haven't had Eric back to do the final flush of the heating before we get the boiler company in to comission it all - plus the upstairs thermostat is not connected....