18th november 9am



18th November 4pm
20th November (yes the fridge has been moved!):
All the insulation ready to go in on top of the new slab - 150mm of the stuff!!! (20th November)

Concrete! 20th November
A hole for the pipes into the island.
Tanking on top of the insulation ready for the UFH pipework (23rd November)
The UFH manifold. Water comes in top left (the valves are the wrong colour on this picture!) and goes back to the boiler bottom left and is distributed to the heating zones from all the verticals.