Wednesday, 6 February 2008

That sinking feeling....

The new drain for the utility. It used to half a 1 1/2 inch waste sunk underground running into a drain int he rear hall. Apparently, this is illegal - only 4in pipes can be underground, so we're getting another new drain laid.

The rear porch is coming on. Now they need to join the sloping roof of the old rear hall to the new flat section and install the box gutters etc.


The front hall on sunday night

and on monday night

We have stripped the stairwell wallpaper, and luckily the plaster is not that bad - just have to find a safe way of painting... time for a longer broom handle on the roller.


The kitchen..... here is the island run with temporary worktop and a gap for the dishwasher. You can see the sink at the end - not the usual installation, it woudl normally face into a corner with walls either side.


The whole kitchen. Top left are two 1000mm drawer units and a 600 drawer line cupboard, the drawer unit int he middle will have the hob on it. Then the corner unit before the run of tall units - oven, oven, larder with pull out wirework, fridge, broom cupboard, then a cupboard run to cover the UFH manifold.


The sink in place - a bit dusty! But you can see how big the main bowl is.


The tall unit run.


The sink complete with tap, soap dispenser and remote switch for the garbage disposal (an InSinkErator ISE65 - must be American with a name like that)


That ISE65 - didn't realise it was that big - good job it's a big cupboard. The clear plastic tube goes to the remote switch - it is an air switch.


Hopefully we'll have the hob in today and the rest of the units ready for the electrician to connect things by the weekend - maybe even a fridge!!!

Thursday, 31 January 2008

BbbbbIiiiiGggggg bath....

Well, it's here, and they got it upstairs!

It's 2000mm x 1250mm and it is now a Bath Room, not a bathroom! The big silver blob on the side is a combined overflow and filler, and you turn it to open/close the waste underneath:


The bath is an Airspa, so it's not a jacuzzi, it blows hot or cold air into the bath so there are no jets for little fingers or toes to poke, just watering can style rose holes on the bath base. Here is all the compressors and gubbins:




We have bought some tap heads to go with it but they look so small, we're putting them on the box surround, not on the bath itself, they are about 1 inch square:

Monday, 28 January 2008

That sink!

Well, it arrived today..... a bit unusual, but nothing special.........hmmm.

A Blanco Modus M-90 in Anthracite Silgranit apparently!















Maybe this makes the point a bit better!!!! IT IS HEEUUGE..... What a beast.



The oven is nice, but pretty ordinary in comparison - hopefully they'll deliver the other one soon!



Geoff has had a busy day! The porch looks great even without glass and a roof.


And the Bow window looks nice all lit up!

Tomorrow is BATH DAY!!!!! Wahey.

Painting... at last

It's been a busy weekend. The main room plaster has dried so we have been painting - the first time I have wished we didn't have the vaulted ceiling with the Velux!

Anyway, the electrics are progressing - although not fast enough!! This is the current meter and fuse board.....


Soon to be replaced by this monster!!!

We've started stripping the stairwell since it was a mixture of fresh plaster and textured wall-paper.

Here is the main room in it's new white livery - I need a wide angle lens !!!!


Some of the kitchen units are here, ready and waiting


And on Saturday this arrived. We were worried that it woudl look huge in the house, but it looks quite small - maybe we should have bought a bigger one ;-)


Yes - this was that much fun to paint.



Parlo has been putting skirting boards and architrave on - what a difference it makes. Now it's starting to look like a room.

Friday, 25 January 2008

Completely Plastered.....

The rear porch is the only major bit of build left to do. We're going for a flat roof to save some money, but the top half is conservatory style - just waiting for it to come from the window company and be fitted.


Here is the cupboard at the top of the stairs. It's a bit smaller than we hoped because the landing needed cutting down to give us clearance up the stairs for building regs, but the cupboard in the bathroom is pretty big which will make up for it.


The ensuite. It looks a bit cramped on the photo, but it isn't in the flesh - the gap into the cubicle is 800mm wide.


This is the secret door at the bottom of the stairs so we can get things up without going round corners.


The main room - not my best photo, but it's all plastered now.


The new front door - it's brown on the outside to match the windows.


All those wires..... New consumer unit is huge to accommodate them all.



The new drain outside. Inspected and passed yesterday so ready to be finished off.



All of this is (almost) just in time. The fridge comes tomorrow, the appliances Monday and the bath on Tuesday. Flooring is booked in for 16th feb - we've found a really good deal on Amtico at T J Flooring (via eBay)

Honey Oak - Ground floor (except snug):



Ceramic dark tiles - bathroom floor: